How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點(diǎn)擊重新得到驗(yàn)證碼
主站蜘蛛池模板: 亚洲欧洲日产国产 最新| 久久综合九色综合网站| 欧美自拍嘿咻内射在线观看| 又黄又爽又色视频| 天天狠天天透天干天天怕∴| 久久国产色av免费观看| 在厨房被c到高潮a毛片奶水| 亚洲熟妇无码久久精品| 性高朝久久久久久久| 99热这里有精品| 被老外添嫩苞添高潮np| 天码av无码一区二区三区四区| 无码中文字幕人妻在线一区二区三区 | 蜜臀av无码一区二区三区| 少妇爆乳无码专区| 小12萝裸体自慰出白浆| 亚洲精品无码永久中文字幕| 亚洲爆乳www无码专区| 精品国产乱码久久久软件下载| 夜夜爽一区二区三区精品| 国产高清一区二区三区视频 | 亚洲av无码之国产精品| 欧美巨大性爽| 亚洲av成人精品一区二区三区 | 少妇无码av无码一区| 五月丁香综合缴情六月小说| 又爽又黄又无遮挡的视频| 国产精品成人久久久久久久| 婷婷五月综合缴情在线视频| 天天夜碰日日摸日日澡| 日韩乱码人妻无码中文字幕久久 | 成年男人裸j照无遮挡无码| 国产精品9999久久久久仙踪林| 精品国产一区二区三区久久| 国产成人av无码精品| 中国娇小与黑人巨大交| av无码免费岛国动作片片段欣赏网| 又黄又爽又色的视频| 亚洲爆乳无码精品aaa片蜜桃| 夜夜爽8888免费视频| 亚洲色大成网站www永久一区|